If you are adding an extension to your Paddington home in NSW, a construction loan can pay your builder in stages instead of in one lump sum. That means you only pay interest on the money you have actually drawn, not the whole amount from day one.
This guide is for owners who already have a property and want to add space. It covers how the money flows, what can trip up a budget, and what to sort out before you talk to a lender. It refers to the Paddington in Sydney, NSW. Deposit, cooling-off and insurance rules differ by state and territory. For example, Queensland caps the deposit at 5 per cent for contracts of $20,000 or more.
How Does a Construction Loan Work for an Extension?
A construction loan releases money in stages as your builder finishes each part of the work. Interest is charged on the amount drawn so far, so early repayments are usually smaller than they would be on a loan paid out in full.
The lender sets the number of drawdowns, the repayment type during the build, time limits, inspection requirements, fees, minimum loan sizes and rates. These differ from lender to lender, so it pays to compare them. A broker can compare construction loan options across many banks and lenders and explain the differences in plain language.
The trade-off is paperwork and timing. Each payment usually needs an invoice, and often an inspection, before the lender releases funds. If your builder expects payment on a different timetable, you may need to plan for a short gap.
Why Do Lenders Want the Building Contract and Council Approval First?
Lenders need to know what is being built, what it costs and that it is legally allowed. That is why they usually ask for your plans, your signed building contract and your council approval before they release funds.
For an extension in Paddington, that means a development application or other council approval, depending on the work. Check with your council about which approval your project needs. Lenders may ask for evidence of your builder's licence and insurance.
If your plans change after approval, tell your broker early. A change in cost can change your loan amount, and a lender may need to look at it again.
Ready to get started?
Book a chat with a Mortgage Broker at WealthStreet Mortgage Brokers today.
How Do Progress Payments Match the Building Stages?
Progress payments are made as each stage of the build is completed, and each one must match the work actually done. In NSW, a contract over $20,000 needs a progress payment schedule, and the payments must match the work carried out.
NSW rules also cap the deposit at 10 per cent of the contract price. The cooling-off period is five clear business days. Where Home Building Compensation Scheme cover is required, which applies to contracts over $20,000, the builder cannot ask for a deposit or other payment until the cover is in place and a certificate is given. These are rules about your building contract. Your lender's drawdown rules sit on top of them.
Building Commission NSW gives $250 to $500 as an indicative cost for each progress inspection. Ask your lender whether it arranges inspections or whether you need to.
What Happens to Repayments During the Build?
Many lenders offer interest-only repayments on the drawn amount during the build, with a switch to principal and interest once the work is finished. The repayment type is set by each lender, so confirm it with yours and ask whether interest-only applies during the build. NSW Government guidance says a borrower financing a project home must start repayments once the first progress payment is made and they begin to draw down. That guidance concerns project home purchases. For an extension, when repayments start and what type they are depends on your lender's terms.
Consider an illustrative example. Say you have drawn $200,000 so far on a $400,000 construction loan, at an example rate of 6.75% p.a. Interest on $200,000 for a year is $13,500, or about $1,125 a month. That is interest only, so the balance does not fall. Repayments rise during the build as more of the loan is drawn.
Now say the build is finished and the full $400,000 is drawn. At the same 6.75% p.a. example rate, interest only on $400,000 is $2,250 a month. When the loan converts to principal and interest over 30 years, the repayment is about $2,594 a month, roughly $344 more.
The outcome is that a borrower who budgets only for the early interest-only payments can get a shock as more is drawn and when the loan converts. Plan for the full repayment from the start. You can test your numbers with a calculator, and a broker can run them against your borrowing capacity before you sign a builder contract. The example rate is for illustration only. Your actual rate depends on your deposit size and your lender.
Can You Use Your Existing Equity Instead?
Sometimes. Some owners use the equity in their current home to fund an extension, and the right choice depends on your lender, your loan size and the cost of the build.
Construction loan fees, minimum loan sizes and rates vary by lender, and a top-up of an existing loan may be drawn down in full or redrawn depending on the product. If you already have a loan, a loan health check can show whether your current loan can handle an extension or whether a switch makes more sense. Refinancing can bring its own costs, so ask what any exit fees would be.
Lenders also check that you can afford repayments with a buffer. Banks and other APRA-regulated lenders must assess your ability to repay at a rate at least 3 percentage points above the loan rate. Non-bank lenders are not bound by APRA's rules but still have responsible lending obligations. Lenders also assess your income and expenses. So your repayments are tested at a higher rate than the one you will actually pay.
Why Is the Builder Choice Part of Your Finance?
Your builder affects your loan because the lender is paying money out against their work. A fixed price contract gives the lender a clear total, while a cost plus contract can make the final loan amount harder to pin down.
If you are weighing up the structure, ask your builder how variations are priced and when they are invoiced. Keep a buffer for surprises, because a lender may not approve extra funds, so check what is allowed for variations before signing.
A useful tip is to ask your builder for the stage payment amounts in writing, then share them with your broker before you sign. That lets your broker match the lender's drawdowns to the builder's invoices so you are not left covering a gap from your own savings.
Call One of Our Team
If you are planning an extension in Paddington, WealthStreet Mortgage Brokers can walk you through your options at a pace that suits you. Call one of our team or book an appointment at a time that works for you.
Frequently Asked Questions
How does a construction loan work for an extension?
The lender releases money in stages as your builder completes each part of the work. You pay interest on the amount drawn so far. Drawdown rules, fees and inspections vary by lender.
Do repayments start straight away on a construction loan?
NSW Government guidance says a borrower financing a project home must start repayments once the first progress payment is made and they begin to draw down. For an extension, the repayment start and type are set by your lender's terms, so ask whether interest-only applies during the build.
What is the maximum deposit for a building contract in NSW?
Under the Home Building Act 1989 (NSW), the maximum deposit is 10 per cent. Work over $20,000 needs a large job contract that includes a progress payment schedule. Deposit rules differ by state and territory.
Do lenders need council approval before paying for an extension?
Lenders usually ask for your plans, building contract and council approval before they release funds. Check with your council about which approval your project needs.